Construction

Please use the appropriate drop-down menu for Labor Rate and Equipment Rate schedules.

LABOR RATES:

Labor Rates include payroll taxes, insurance, overhead and profit for up to 40 hours per week.  Any time in excess of 40 hours per week, before 7:00 AM and after 5:30 PM, or on holidays will be charged at one and on-half times the listed rate.  Per Diem rates shown are minimums and will be charged when crews are required to stay overnight when out of town.  Time starts and stops at the Zaval-Tex Construction yard.  Rates do not include state and local sales taxes.

Billable Holidays (when worked):

  • New Years Day
  • Easter (Friday through Sunday)
  • Memorial Day
  • Independence Day
  • Labor Day
  • Thanksgiving (Thursday and Friday)
  • Christmas Eve and Christmas Day

EQUIPMENT RATES:

Tools listed with an asterisk (*) on the equipment rate schedule are included in the tool van monthly rate for projects over 30 day duration.

Equipment rates include fuel, oil, grease, maintenance, use taxes and licenses.  Welding Rig rate includes all consumables (rods, gases, grinding disc, etc.) but does not include Alloy welding rods or gases, which will be reimbursable.

Transportation to and from job sites is not included in rates.  Operators are not included in rates unless specified.

Overtime will not be charged on equipment.  A mimimum charge of 4 hours is required on all hourly-priced equipment.  Rates do not include state and local sales tax or permits.

Third-party rental equipment (not covered above) requiring fuel and maintenance is to be charged at cost, plus 35%.  All other 3rd-party rental equipment (non-fueled) is to be charged at cost, plus 15%.

All materials and sub-contractors shall be reimbursed at cost, plus 10%.

Zaval-Tex Logo

Advertisements